Learning the Window Installation Process After Production
본문
the pre-installation phase requires careful planning to ensure a smooth delivery and installation.
Pre-Installation Phase
-------------------
Before the installation team arrives several preparation activities take place at the manufacturing facility. These comprise:
- Visual inspections to ensure the windows are free from damage and potential harm
- Packaging and displays measures to prevent damage during transportation
- Dispatch of installation materials, such as insulation, flashing, and sealants
- Communication with the installation team to schedule the delivery and installation
---------------------------
Upon arrival on-site, the installation team begins by conducting a site survey to assess the installation area. This involves:
- Measuring the opening and confirming it is accurate
- Confirming the surrounding areas are clear of debris and obstacles
- Checking for any obstacles that may hinder the installation process
- Confirming the type of frame system being used to ensure correct fit
------------------------
Before the new window can be installed, the old window must be removed. This is usually done by:
- Prising the old window out of the frame using a gentle prying motion
- Disconnecting
- Taking out any flashing or sealants around the old window
- Preparation the frame for the new window
---------------------
The installation team then prepares the frame for the new window by:
- Clearing the area to ensure a even seal
- Applying flashing around the frame to prevent water ingress
- Using primer or specialized coatings to the frame for sealing
- Applying a sealant or weather-tightening system around the frame
---------------------------
The new window is then carefully installed into the prepared frame. This involves:
- Confirming the window is correctly aligned with the frame
- Using shims and wedges to adjust for any irregularities
- Tapping the window gently into position to firmly fix it
- Tightening all screws or bolts to ensure a firm fit
----------------------------
Once the window is installed, the installation team conducts a series of checks and inspections to guarantee the window is functioning as intended. This includes:
- Testing the window for correct operation and balance
- Inspecting the sealant and flashing for any gaps or signs of compromise
- Checking for proper thermal efficiency and performance
- Documenting the installation process and keeping a record for future reference
댓글목록0
댓글 포인트 안내